After-sales Service: | Provide Spare Parts, Technologys Support |
---|---|
Warranty: | Provide Spare Parts, Technologys Support |
Emission Standard: | / |
Still deciding? Get samples of $ !
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Technical Parameters |
Category | Item | Unit | Parameter | |
Size Parameter | Total length | mm | 8325 | |
Total Width | mm | 2500 | ||
Overall height | mm | 3698 | ||
Mass Parameter | Number of passengers (including driver) | PCS | 3 | |
Gross mass | kg | 12155 | ||
Main Performance Parameters | Rated voltage (GB/T9465-2008) | kV | 10 | |
Rated load of working platform | kg | 290(tandem) | ||
Maximum working height | m | 18.5/19/20 | ||
Maximum working height | m | 2.55 | ||
Maximum working range | m | 13.5 | ||
Working height at max. working height | m | 12 | ||
Platform Slewing | º | 360(discrete) | ||
Maximum lifting weight | KG | 500 | ||
Outrigger span | Horizontal (front/rear) | mm | 3600 | |
Vertical (left/right) | mm | 3750 | ||
Boom slewing speed | s/r | 60~85s | ||
Boom slewing time | s | ≥50 | ||
Driving parameters | Maximum speed | km/h | 89 | |
Driving parameters | Minimum Ground Clearance | mm | 248 |
Vehicle Configuration |
Name | Parameters |
Chassis | Dongfeng DFH1140B Class II Chassis |
Engine | B6.2NS6B210 engine, maximum power 154kW, National VI emission standard |
Cab | Single-row seat, 3 passengers, cab equipped with air conditioning |
Hoardings and Walking Boards | Anti-slip walkway plate, stainless steel fence, both sides of the large toolbox form of protection |
Take-off systems | Electromagnetic power take-off, power take-off and gearbox direct connection |
Work platform | 1.22×0.72×1.05m, end-mounted two-person fiberglass platform, pressure-resistant 50kV liner; rocker handle to realize all-direction movement of the working platform (upper arm lift, lower, upper arm telescoping, rotary table rotation), including the safety trigger function, hydraulic working platform ± 90 ° rotation, vertical tilting function; rated load of 290Kg, emergency stop / discharge valve |
Booms | Folding + telescopic arm |
Slewing device | 360°continuous rotation |
Outriggers | A-type outriggers |
Operation | Fixed operation of working platform and turntable, the whole vehicle can realize emergency operation of electric pump. |
Control system | Full hydraulic proportional control system to realize stepless speed regulation and open-loop hydraulic control system. |
Leveling system | Master-slave hydraulic leveling device |
Other | Engine ignition and shut-off device at work platform, hydraulic tool interface at work platform, work platform liner, polyethylene work platform guard, hydraulic boom luffing and slewing, platform lifting device (optional) |